HASA EXTENSION
Location
Tampere
Address:
Hatanpäänkatu 24
Year:
2017
Phase:
finished
Area:
6 770 brm²
Customer:
City of tampere
Renovation and extension designed in collaboration with Arkkitehdit Kontukoski Oy. The commission includes operation theaters, recovery rooms, outpatient clinics, instrument maintenance, public and ambulance traffic entrances and a new lobby. The lobby area includes a library, cafeteria, conference rooms and register and information help desks with self-service machines. Estimated cost is 12 million euros. The construction was realized in multiple phases, and it was finished in 2016. The planning utilized BIM technology and included working with visualization, 3D models and construction site visits.